Renshaw bridge repair

TylerG

Super Mod Geek
Administrator
Moderator
Joined
Nov 7, 2006
Messages
31,439
Reaction score
29,270
Location
Parkland County
Is there any update on the bridge being fixed for this upcoming season?
Lots of noise over on crackbook asking for letters of support and signatures to try to get it repaired. They never created anything other than a poll there that won't hold its weight anywhere. Apparently McBride chamber of commerce now stepping in to try to get government support.
 

sledneck__11

Active VIP Member
Joined
Jan 16, 2011
Messages
1,636
Reaction score
5,460
Location
saskatchewan
We never even went to renshaw this year because of the bridge shitshow such a snowmobile driven town has to be feeling the crunch, more needs to be done to get this pushed through and repaired
 

TylerG

Super Mod Geek
Administrator
Moderator
Joined
Nov 7, 2006
Messages
31,439
Reaction score
29,270
Location
Parkland County
If anyone knows Justina from Cougar Mountain Lodge she's the one that was spearheading the Facebook poll. She can probably give you a good update
 

rknight111

Administrator
Administrator
Moderator
Joined
Sep 27, 2006
Messages
13,681
Reaction score
23,430
Location
Parkland County, AB and Valemount, BC
Website
www.snowandmud.com
If anyone knows Justina from Cougar Mountain Lodge she's the one that was spearheading the Facebook poll. She can probably give you a good update
Not on Facebook but I do not support CML as they forgot who there regular customers were when the oilfield was paying big bucks for rooms, good luck to get our business back
 

06 Dragon

Active VIP Member
Joined
Nov 17, 2006
Messages
2,188
Reaction score
3,990
Location
Red Deer County
Lots of noise over on crackbook asking for letters of support and signatures to try to get it repaired. They never created anything other than a poll there that won't hold its weight anywhere. Apparently McBride chamber of commerce now stepping in to try to get government support.
F the government support. It will take 10 years for them to accomplish anything.
Obviously they are not hauling logs out of there, cause they would not be able to cross the bridge. Most of the bridges on the logging roads are in terrible shape, and all they ever seem to do is derate them.
I say let people make donations to the sled club for a new bridge or upgrading it so snowmobiles can use it.
I believe sledders used it this winter anyway in its current state. They just did not allow the groomer to cross over.
Could have got a crane to lift the groomer and drag over and groomed the other 26 km of trail.
Besides that, did they not allow the groomer over in the spring for the club to clean out the cabin.
Curious as to how much the businesses in town and club lost in revenue over this?
 

TylerG

Super Mod Geek
Administrator
Moderator
Joined
Nov 7, 2006
Messages
31,439
Reaction score
29,270
Location
Parkland County
F the government support. It will take 10 years for them to accomplish anything.
Obviously they are not hauling logs out of there, cause they would not be able to cross the bridge. Most of the bridges on the logging roads are in terrible shape, and all they ever seem to do is derate them.
I say let people make donations to the sled club for a new bridge or upgrading it so snowmobiles can use it.
I believe sledders used it this winter anyway in its current state. They just did not allow the groomer to cross over.
Could have got a crane to lift the groomer and drag over and groomed the other 26 km of trail.
Besides that, did they not allow the groomer over in the spring for the club to clean out the cabin.
Curious as to how much the businesses in town and club lost in revenue over this?
from what I have read/heard through the grapevine, it's been very huge revenue loss
 

Bnorth

Active VIP Member
Joined
Dec 18, 2010
Messages
10,790
Reaction score
20,864
Location
Salmon Arm
Too much red tape BS these days. Probably need hydrological, environmental, biological, and archeologic surveys just to replace an existing FSR bridge. Replacement needs to happen in the fish window which is usually at lowest flow in Jan/Feb. Used to be you could just rip it out and slap in an old railway flatcar or two as a bridge. Now so complicated it's out of reach financially for anyone but the gov't or a major corporation.
 

pano-dude

Active VIP Member
Joined
Nov 17, 2007
Messages
4,774
Reaction score
15,714
Location
invermere
Too much red tape BS these days. Probably need hydrological, environmental, biological, and archeologic surveys just to replace an existing FSR bridge. Replacement needs to happen in the fish window which is usually at lowest flow in Jan/Feb. Used to be you could just rip it out and slap in an old railway flatcar or two as a bridge. Now so complicated it's out of reach financially for anyone but the gov't or a major corporation.
It really depends on government staff, we got permits to construct new abutments and a new bridge built last fall to access our managed area. It all came together in less than a month.
 

brian h

Active VIP Member
Joined
Jul 21, 2009
Messages
858
Reaction score
1,517
Location
edmonton alberta
Was a huge revenue loss for the town from what I heard and the town of McBride will do what they can to get up and running for next season. They are probably working thru the red tape and making sure everything is a go before announcing anything. The red tape will be the hardest part and most time consuming
 

Cableguy

Active VIP Member
Joined
Dec 16, 2014
Messages
2,117
Reaction score
5,043
Location
Okanagan
need to contact Forbes cst out of pg
think Andrew is still involved although I heard he may have sold out
they used to do a lot of forest rd bridges
 

MP Kid

Active VIP Member
Joined
Dec 20, 2010
Messages
3,148
Reaction score
4,347
Location
East of Calgary
It really depends on government staff, we got permits to construct new abutments and a new bridge built last fall to access our managed area. It all came together in less than a month.
Damn unelected bureaucrats…
This is a root of many problems…
Glad to hear that at least one place common sense prevailed.
 

blastoff

Active VIP Member
Joined
Feb 20, 2007
Messages
2,478
Reaction score
969
Location
Alberta
And then an indigenous inspection has to be done
Oh when will it end!!
 

greenthumb

Active VIP Member
Joined
Mar 16, 2013
Messages
736
Reaction score
2,718
Location
Shuswap
Serious question. Why don't the group of you that want the bridge re-opened get together and see what you can do to help?
Sled clubs are non-profits that rely heavily on volunteers. There can't be much in the way of resources in McBride and I suspect the vast majority of users are out of towners anyway.
Just a thought.
 

papajake

Active VIP Member
Joined
Dec 5, 2006
Messages
2,941
Reaction score
5,885
Location
Didsbury, Alberta
you can't just build a bridge on government land permit after permit is required environment assessments done you might kill a frog doing it
 
Top Bottom