It makes no sense, but that does seem to be the place. If only they would build a proper bridge from the power transfer field connecting to the trail it would save every rider about 50 minutes every day of screwing around (trailing, loading and unloading, highway crossing, train track crossing, and a bunch of pointless trail riding).