Ariel view of highway washout at Eagle Valley

RETODD

Active VIP Member
Joined
Feb 20, 2008
Messages
7,317
Reaction score
210
Location
The business end of a Beer!
Website
www.valemountvacationrental.com
That is not going to get fixed in a day :eek::eek::eek:

ATT00003.jpg

ATT00004.jpg

ATT00005.jpg

ATT00006.jpg

ATT00007.jpg

ATT00008.jpg

ATT00009.jpg
 

magnet

Active VIP Member
Joined
Apr 29, 2008
Messages
5,364
Reaction score
1,391
Location
GSBA
i guess thats proof we should be careful what we wish for. they wanted some moisture. but on the other hand a few bales and a couple sheets of plywood and we should have the second lane open by mid day tommorrow.:d
 

arff

Active VIP Member
Joined
Apr 21, 2009
Messages
141,934
Reaction score
56,107
Location
Leduc
Few months of work...........WOW
 

goodngrubby

Active VIP Member
Joined
Nov 29, 2008
Messages
3,452
Reaction score
4,827
Location
Nanaimo
What a mess. Here's a few more.
 

Attachments

  • image001.jpg
    image001.jpg
    63.3 KB · Views: 41
  • image002.jpg
    image002.jpg
    31.1 KB · Views: 34
  • image003.jpg
    image003.jpg
    41.1 KB · Views: 34
  • image004.jpg
    image004.jpg
    37.6 KB · Views: 48
  • image005.jpg
    image005.jpg
    48.5 KB · Views: 53
  • image006.jpg
    image006.jpg
    38.4 KB · Views: 49

Modman

Active VIP Member
Joined
Mar 13, 2008
Messages
6,029
Reaction score
8,445
Location
Castlegar
Few months of work...........WOW

Competent crew would have that sewn up and driveable, ready for pavement in 3 weeks once the water is lower. Too bad it will be a highways job and will cost 5 times more than it should and take 7 times longer than it should.
 

Mike270412

Golden Boy
Joined
Apr 29, 2008
Messages
29,370
Reaction score
47,924
Location
GBCA
Competent crew would have that sewn up and driveable, ready for pavement in 3 weeks once the water is lower. Too bad it will be a highways job and will cost 5 times more than it should and take 7 times longer than it should.

Saw it on the news last night.They already had a ton of equipment out there.Figured a couple days to get a temp fix on one side so traffic could use it.But,you're right,they will make a summer-long project out of it.
 

Modman

Active VIP Member
Joined
Mar 13, 2008
Messages
6,029
Reaction score
8,445
Location
Castlegar
Saw it on the news last night.They already had a ton of equipment out there.Figured a couple days to get a temp fix on one side so traffic could use it.But,you're right,they will make a summer-long project out of it.

Yeah, they will make it passable but will not get the compaction, just enough to get the traffic through. They will have to do one side so they can open the highway temporarily, work on the other side in the meantime, finish one side then open it for traffic, then go back and rip up the side they installed to open the highway temporarily and re-do it properly. Right now they are just working with a stop-gap measure. I hope they have a bigger culvert on order already as well, no point in putting two more of the same size back in, but they probably will.

Even with all the work to both sides, it still should only take 3 weeks. What do I know though, its not like I deal with construction logistics all day........;)
 

magnet

Active VIP Member
Joined
Apr 29, 2008
Messages
5,364
Reaction score
1,391
Location
GSBA
what are you guys talkin about it will be govt job your looking at end of next summer for expected completion date if lucky.
 

Summiteer

Active VIP Member
Joined
Nov 8, 2006
Messages
5,883
Reaction score
3,508
Location
Whitecourt, Ab
thats what happens when you fill in the river valley and put in a couple of culverts..........bridge would hace cost more to put in but traffic'd still be flowing.
Do you still get insurance if you build in a flood plain?
 

arcticdodge

Active VIP Member
Joined
Nov 15, 2006
Messages
616
Reaction score
232
Location
Redcliff Alberta
It is a real mess out this was. Alot of golf courses said they are done for the year to repair the damage. The highwas are destroyed, bridges are out here there and everywhere. Alot of people have insurance but depending on what you carry alot of them will be on there own. Right now the traffic is getting detoured up highway 41 to Oyen where you can enter into Sask and go to where you need from there.. If you know the area there are other roads to take. Sorry to all the people who lost any or all of their possessions. :(
Will try and post some pics
 
Top Bottom