What Did You Do In Ur Garage?

Jobu

Active member
Joined
May 28, 2019
Messages
80
Reaction score
106
Location
Stony Plain, Ab
I'm in the metal business so it was free for me. It's less than two full 4x10's of metal though so it's a pretty small job to most shops that can do this kind of thing.
EDIT: Reached out to the guy that made it for me. Said it'd be about $250. It's a total of 15.5' lineal feet, 24" top, 2-4" backsplash depending on which section and the 4.125" bottom fold for the bench front.
 
Last edited:

CountryRider

Active VIP Member
Joined
Oct 28, 2010
Messages
1,840
Reaction score
1,391
Location
Cold Lake AB Canada
Makin trac bars for the dirtymax
 

Attachments

  • 20210107_152607_copy_600x1067.jpg
    20210107_152607_copy_600x1067.jpg
    338.6 KB · Views: 330
  • 20210106_190242_copy_800x450.jpg
    20210106_190242_copy_800x450.jpg
    143.8 KB · Views: 333

CountryRider

Active VIP Member
Joined
Oct 28, 2010
Messages
1,840
Reaction score
1,391
Location
Cold Lake AB Canada
Also trying to wrap up my ZRP front end for the next sked trip 🤘
 

Attachments

  • 20210104_073457_copy_800x450.jpg
    20210104_073457_copy_800x450.jpg
    141.4 KB · Views: 334
  • 20210104_073350_copy_600x1067.jpg
    20210104_073350_copy_600x1067.jpg
    280.9 KB · Views: 335
  • 20210103_111110_copy_800x450.jpg
    20210103_111110_copy_800x450.jpg
    170.6 KB · Views: 338

CountryRider

Active VIP Member
Joined
Oct 28, 2010
Messages
1,840
Reaction score
1,391
Location
Cold Lake AB Canada
Start of a 4x8 welding table today
 

Attachments

  • 20210112_155042_copy_600x1067.jpg
    20210112_155042_copy_600x1067.jpg
    262.4 KB · Views: 306
  • Snapchat-460605756_copy_600x1193.jpg
    Snapchat-460605756_copy_600x1193.jpg
    253.8 KB · Views: 295

Tchetek

Active VIP Member
Joined
Nov 11, 2013
Messages
2,858
Reaction score
7,302
Location
Alberta
Start of a 4x8 welding table today

What’s the plan for the top? Holes, slots, Chinese buffet turn table? Slide out or cutting table extensions?

I’ve been trying to get a plan together for table/cart combo. Casters and fork liftable skid unit to build and store my new machine, plasma and metal tools all together under the work surface.
 

CountryRider

Active VIP Member
Joined
Oct 28, 2010
Messages
1,840
Reaction score
1,391
Location
Cold Lake AB Canada
What’s the plan for the top? Holes, slots, Chinese buffet turn table? Slide out or cutting table extensions?

I’ve been trying to get a plan together for table/cart combo. Casters and fork liftable skid unit to build and store my new machine, plasma and metal tools all together under the work surface.

Lil bit more progress here tonight after work.

Planning on having 4x4 of it 1/2" top plate with angle iron trough and drain bungs in the corners for catching fluids cleaning engines ect, and the other 4x4 will be slats made from 1x3 spaced at 1" to allow for clamps, end of the slatted section will be a 7' slide out for chop saw and what not purposes, and was gonna build in a turntable on the slatted section, but ill just use a removable lathe chuck clamped to the slatted section,

Ill keep ya updated with pics as i go
 

Attachments

  • 20210114_222033_copy_800x450.jpg
    20210114_222033_copy_800x450.jpg
    141.7 KB · Views: 466

Beer Slayer

Active VIP Member
Joined
Dec 2, 2018
Messages
1,417
Reaction score
3,441
Location
Great Lakes
fawk the table.. look at the shop tv!! Hard to get projects done when you are busy drinking beer and watching sled videos.


LOL, Phuck the TV, look at the bad ass band saw! ...obviously I'm not a TV guy.

Table is taking shape, keep up the good work!
I'll be building a 4x8 in the next couple months...I've watched a few You Tube builds for ideas, also have a few of my own.
 
Top Bottom