need to build a deck that is less than 2' from grade. how deep do the plies need to be ? i've heard everything from 4' down to 12 ' down . I'm thinking 5' down to be 1' below frost line using a 8" sonotube . I hope on the right path .
need to build a deck that is less than 2' from grade. how deep do the plies need to be ? i've heard everything from 4' down to 12 ' down . I'm thinking 5' down to be 1' below frost line using a 8" sonotube . I hope on the right path .
---- Need to check with the BYLAWS regarding permits -- drawings and -- pile depths at ------------------ ------------ Permit forms are here at ---- ---- Was unable to find the actual pile drawings for Spruce Grove but am sure they are the same as Edmontons at =-------- Deck Drawings It cost 3 times as much to have a building permit approved after construction -- so best to get the approval before starting...need to build a deck that is less than 2' from grade. how deep do the plies need to be ? i've heard everything from 4' down to 12 ' down . I'm thinking 5' down to be 1' below frost line using a 8" sonotube . I hope on the right path .
I went 10' down and 10" diameter. I go with the better safe than sorry attitude. I spend a fair bit on a composite deck and I didn't want it to move. My deck goes from the front of the house and wraps around and down the side and then wraps around into a large back deck, so for me the extra cost was justified.
Was it worth the extra for the composite and how's it standing ip? Boss is contemplating on his as very pricey. Est. for material only is 56k without the solarium he wants to put on the ground level.