- Thread starter
- Staff
- #21
- Joined
- Oct 21, 2006
- Messages
- 48,082
- Reaction score
- 32,189
- Location
- Edmonton/Sherwood Park
- Website
- www.bumpertobumper.ca
Apparently The Pto Side Connecting Rod Bearing Piled Up --- THE CYLINDERS AND PISTONS WERE LIKE NEW, THEY SAID... They Sent The Engine Back To Brp For "investigation".... And Pulled The New Engine From A New 2007 1000rt Crate Summit They Have Been Stealing Parts From All Year Long.... I Was Very Impressed With Martin Equipment And Their Ability To Get The Sled Ready, Even Though It Was Supposed To Be Ready By The Time I Got Back From Mexico... Thanks To Craig(tech) And Dave(service Manager) They Finished It Up So I Can Tweak And Get It Ready For Trout Lake This Weekend!!! Brp Couldn't Give Us An Eta On A "new" Engine From The Factory, So I Was Happy With This...... Makes You Wonder What They Are Dooing With The Warehouse Full Of 1000's They Have.... Hmmmmm, Can You Say 1000xp For Next Year???