September 14 and 15 looks like the days for repair. These bridges have to be done this year or we may not be able to put the groomer on them this winter. All materials have been purchased and looks like we will only need a few bodies to rip off the old decks and install the new. This is going to be a big job and help will be needed if we can get it. We will have a skidsteer there so far and a bridge enginner to supervise the install and demo. Will post more details next week.