new garage build

NoBrakes!

Active VIP Member
Joined
Nov 13, 2011
Messages
6,365
Reaction score
12,971
Location
Edmonton
looking to put in a 30x30 garage in the city, we have concrete and framer/drywall family ad friends to help. what should a guy expect to pay for the package and pad? 10K for package, 10K for pad, 10K to finish exterior/interior? just getting an idea...
 

niner

Active VIP Member
Joined
Mar 14, 2009
Messages
8,685
Reaction score
62,646
Location
lacombe
Your pad at 5” thick and thickened footing 2’x24”x10” thick will take approximately 15metres of Concrete. Estimate at $200/ m. Brown guys charge $2 a sq/ft to place and finish and white guys charge $3.50.
 

busted2x

Active VIP Member
Joined
Sep 25, 2015
Messages
517
Reaction score
862
Location
AB
Last time I built one was 2007, with a 2’ foundation wall and fully finished inside including electrical was 28k.
 

NoBrakes!

Active VIP Member
Joined
Nov 13, 2011
Messages
6,365
Reaction score
12,971
Location
Edmonton
this is the start, maybe a single double door instead... inside will be drywall and then puck board or checker plate
 

Attachments

  • Capture.jpg
    Capture.jpg
    48.3 KB · Views: 408

NoBrakes!

Active VIP Member
Joined
Nov 13, 2011
Messages
6,365
Reaction score
12,971
Location
Edmonton
Last time I built one was 2007, with a 2’ foundation wall and fully finished inside including electrical was 28k.

what did you have to do? was that turn key from a builder?
 

NoBrakes!

Active VIP Member
Joined
Nov 13, 2011
Messages
6,365
Reaction score
12,971
Location
Edmonton
Your pad at 5” thick and thickened footing 2’x24”x10” thick will take approximately 15metres of Concrete. Estimate at $200/ m. Brown guys charge $2 a sq/ft to place and finish and white guys charge $3.50.

so I need around 850-900sqft plus the driveway so 7-8K should get it done
 

Beels

Active VIP Member
Joined
Dec 14, 2009
Messages
1,071
Reaction score
2,153
Location
Swirvin' like George Jones
I'm looking to get one done this year, as well. What does everyone recommend to finish the interior with? The last one I had had OSB sheeting inside that was painted by the previous owner. Do that again, drywall or tin?
 

NoBrakes!

Active VIP Member
Joined
Nov 13, 2011
Messages
6,365
Reaction score
12,971
Location
Edmonton
I've heard puck board on drywall is easy to clean and care for. I'd like to do aluminum checker plate 4' high all around on the 2' foundation
 

niner

Active VIP Member
Joined
Mar 14, 2009
Messages
8,685
Reaction score
62,646
Location
lacombe
I'm looking to get one done this year, as well. What does everyone recommend to finish the interior with? The last one I had had OSB sheeting inside that was painted by the previous owner. Do that again, drywall or tin?

we use this product lots.
 

doorfx

Active VIP Member
Joined
Jan 10, 2011
Messages
10,050
Reaction score
24,523
Location
calgary ab
22’ x 22’, 18,000k 2 years ago. Complete exterior and pad but no interior or gas or electrical. Also built a gate and rv pad for that.


If you need gas or heat installed contact Mach1 on here , good guy , fair priced and does good work.
 

Cyle

Active VIP Member
Joined
Jan 21, 2008
Messages
7,182
Reaction score
4,762
Location
edmonton
Your pad at 5” thick and thickened footing 2’x24”x10” thick will take approximately 15metres of Concrete. Estimate at $200/ m. Brown guys charge $2 a sq/ft to place and finish and white guys charge $3.50.

Holy chit who's paying rates that high? Most placing and finishing is under $1 sq/ft. $3.50 sq/ft is absolutely insane for 900 sq/ft.

Just my 2 cents, but thickened edge slabs are the biggest waste of money ever. Either get it engineered, or to make city happy make it look like it. Go with a 6" slab with 15mm bar on 12" centers if you're really worried about it, and you'll have 100x the floor of the thickened edge.
 

busted2x

Active VIP Member
Joined
Sep 25, 2015
Messages
517
Reaction score
862
Location
AB
what did you have to do? was that turn key from a builder?

No, I did infloor heat, so I laid all the pipe, hired out all the concrete work, framed it myself, with a package. Hired out electrical, gas, and drywall. That was taped/finished and primed. Getting power and gas from house to garage was a big cost, and obviously concrete, and I went mental with lights and plugs. Wish I could have taken that garage with me when I moved. I also had a single door. 16x8. Garage was 28x28.
 

busted2x

Active VIP Member
Joined
Sep 25, 2015
Messages
517
Reaction score
862
Location
AB
Your pad at 5� thick and thickened footing 2’x24�x10� thick will take approximately 15metres of Concrete. Estimate at $200/ m. Brown guys charge $2 a sq/ft to place and finish and white guys charge $3.50.

My brother in law owns a concrete company in edmonton, and is nowhere near that. That must include ground work and rebar and everything. He’s coming down to Lethbridge to do a sizeable pour for me for 1.65/ft place and finish only. And that included travel expenses. Also, definitely not brown and is a j-man
 

niner

Active VIP Member
Joined
Mar 14, 2009
Messages
8,685
Reaction score
62,646
Location
lacombe
My brother in law owns a concrete company in edmonton, and is nowhere near that. That must include ground work and rebar and everything. He’s coming down to Lethbridge to do a sizeable pour for me for 1.65/ft place and finish only. And that included travel expenses. Also, definitely not brown and is a j-man
Yes ballparking forming,groundwork,and placing and finishing. But I’m more rural and do lots of traveling. City guys work for a lot less.
 

52weekbreak

Active VIP Member
Joined
Jun 17, 2013
Messages
1,929
Reaction score
4,058
Location
SPAB
looking to put in a 30x30 garage in the city, we have concrete and framer/drywall family ad friends to help. what should a guy expect to pay for the package and pad? 10K for package, 10K for pad, 10K to finish exterior/interior? just getting an idea...

At 30 X 30 you will need an engineered foundation. . Screw piles seem to be the most popular as opposed to drilled concrete piles.

My uncle just poured a 2,000 square foot driveway in front of his garage on an acreage south of Leduc. He was quoted $20K for form, supply, place and finish. He did the forming, laid the rebar and had a placer/finisher do the work for $1.50 square foot. Looks good and cost around $6,000 or so.

Interior finish for me would be drywall. If you need extra strength, put 3/8 to 1/2 inch OSB underneath. If you are praying water inside, you will need to cover the drywall with puckboard or tin.

Budget is $20,000 on the very bottom end and can easily hit $50,000 if you hire most of it out and get the cool floor finish. I was quoted $6.00 per square foot by Garage Strategies which was about the same as the cost to form, prepare, supply and place the garage floor which is 6 inches thick.

Don't forget to prepare backings for hanging stuff and maybe a lifting point or two in the ceiling. Have fun
 

NoBrakes!

Active VIP Member
Joined
Nov 13, 2011
Messages
6,365
Reaction score
12,971
Location
Edmonton
Is in floor the way to go? I'll be doing a lot of the grunt work and we are lucky enough to have a ton of tradesman friends and family. Ive assisted laying and tied rebar and in floor pipe before. thanks for the engineered pad heads up, might shrink it or is it worth getting engineered?
 

BEL

Active VIP Member
Joined
Mar 3, 2015
Messages
753
Reaction score
861
Location
Alberta
We have in floor in the basement and garages of two houses and would not buy another without it. I set the temperature in the garages at 18 Celsius in the fall and don't touch it until spring, you'll love being able to walk around in sock feet or laying down while working on something.
 
Top Bottom