polaris011
Active VIP Member
Have you looked at pre cast concrete?? Might be an easy way to go. No outside or inside finishing required !!
Sent from my SM-G920W8 using Tapatalk
Sent from my SM-G920W8 using Tapatalk
1/2in a ft sq tied to piles and drilled into grade bean. has moved in 17yrs other than a few line cracksCurious how much rebar you did in your floor. To make a true suspended floor with piles takes a lot of rebar. If you just did a normal grid your not using the piles to there full potential.