If floor to ceiling thats a good way to go you could always cut around the cabinet so you can get the return to the floor and then just schluter to the bottom of the cabinet and then the same on top. or sometimes its easier to just continue behind the toilet and up to make thing work.
generally you want a return to the floor in tile on both sides. Especially if your using a curtain. The water will trace down the edge of the tub and rot the wall board in no time. A good tile setter will spit the difference from the middle of the wall so your salvage cuts will be equal. A re...
WIth this scenario who hold the keys to the crypto? bitstamp? If so I'm not interested. I've been rug pulled before, this seems almost to good to be true.
I have a 570 and a 800r gen 1 can am and I prefer the 570. lighter quieter and way cooler running. but im not mudding my machines so smaller is better for me.
It may not be approved but it still works. I vented a 800 block at about 1000km. After that ran oil in the fuel for a calculated total of 20:1 with injecton and went 8000km on the next one. This was 2 generations of sled ago so I may be talking out of my ass lol.