changed a tunnel out on a 08 xp last year cuz it got bent, its a big job probably about 15 hours total. not very long stipping it but getting everything back together a fitted just so took most of the time. I guess it depends how bad you like a powder coat????? oh and if you can hang it from the ceiling it works good for splitting the tunnel off.
 

blastoff

Active VIP Member
Joined
Feb 20, 2007
Messages
2,507
Reaction score
1,046
Location
Alberta
I believe the flat rate time is 18 hours to change out a tunnel.
 

flabbajabba

Active VIP Member
Joined
Mar 7, 2008
Messages
750
Reaction score
303
Location
Edmonton
We started on my friends 09 got everything off the top took about one day we worked till the motor was out then waiting for time to do jack shaft and skid/etc. Its scary for newbies(us) but going good so far. I'll take the camera next time and show some progress. Has to be back together for Nov 27! I spend more time trying to talk him into Pipe/Y pipe/Reeds/Big bore/etc then working. LOL I keep telling him "If you are ever going to do it.....":beer:
 

vpfuelman

Supporting Vendors
Joined
Sep 24, 2007
Messages
137
Reaction score
48
Location
Edmonton
you have to strip the sled down to the frame and remove the front cooler and tape the bottom of the rear cooler to powder coat the tunnel/bulkhead ...there is little cooling transfer through powder coating ..if you can take thecoolers out and anodize them for better cooling properties ..
 

shoppingcart111

Active VIP Member
Joined
Sep 21, 2007
Messages
1,685
Reaction score
559
Location
Edmonton
I've decided against it, too much work right now. Decided to p coat certain pieces instead.

Thanks guys.
 